Criterion: Emergency Egress
Documented evaluation of emergency egress requirements, adequate and maintained emergency exits, appropriate signage, lighting, and testing of egress systems in all Facility buildings.
Full Description
OHS08 Emergency Egress
Standard Section: 8.8 Category: Occupational Health Safety Scheme: Responsible Minerals Assurance Process (RMAP) Standard Version: 2.0 for Piloting (effective April 30, 2025)
Overview
Documented evaluation of emergency egress requirements, adequate and maintained emergency exits, appropriate signage, lighting, and testing of egress systems in all Facility buildings.
Requirements
The Facility shall:
- 8.8.1 Maintain a documented evaluation of the emergency egress requirements for each building owned and operated by the Facility as determined by national standards.
- 8.8.2 Take into account potential emergency scenarios when planning and developing infrastructure through installation of early warning systems, alarms, emergency exits, emergency exit signage, lighting and ventilation, emergency lighting, emergency wash stations, back-up energy systems, and refuge stations.
- 8.8.3 Ensure emergency exits are appropriate in number, location, adequacy.
- 8.8.4 Ensure emergency exits are maintained in an unlocked, operating, and unobstructed condition.
- 8.8.5 Ensure emergency pathway lighting and signage are adequate, regularly tested, operating and in the appropriate language(s) for the work force.
Source: RMI Facility Standard for Social, Environmental, OHS and Governance Risks, Version 2.0 for Piloting (April 2025), Section 8.8
Profiles using this criterion
Responsible Minerals Assurance Process
Conformity Alignment
Meets
Pass: Yes
Definition: "Facility maintains a documented egress evaluation for each building, takes into account emergency scenarios in infrastructure planning with installation of alarms, exits, signage, lighting, ventilation, and backup systems. Emergency exits are appropriate in number, location, and adequacy. All emergency exits are maintained in an unlocked, operating, and unobstructed condition. Emergency pathway lighting and signage are adequate, regularly tested, operational, and in appropriate language(s)."
Partially Meets
Pass: No
Definition: "Emergency egress system exists but is incomplete: e.g., documented egress evaluation is absent, emergency exits exist but are insufficient in number or poorly located, lighting or signage is not in all required languages, testing of emergency lighting is not documented, or minor obstructions are present."
Remediation: 180 days
Does Not Meet
Pass: No
Definition: "No documented egress evaluation, insufficient emergency exits for the building size, or emergency exits are locked, blocked, or not maintained in operational condition."
Remediation: 90 days
Priority
Pass: No
Definition: "A Priority finding is raised for locked, blocked, or insufficient emergency exits that constitute an immediate and substantial threat to worker life, in alignment with Annex I of the Operations Manual."
Remediation: 30 days
Not Applicable
Pass: Yes
Definition: "This criterion is not applicable to any facility - all facilities with enclosed workspaces must provide adequate emergency egress."
Not Able To Assess
Pass: No
Definition: "The assessor was unable to inspect emergency exits, egress routes, lighting, signage, or access egress evaluation documentation."